BRENT A

The first of three of Brent A’s 3000t jacket frame sections being rolled up to vertical at the Redpath Dorman Long yard in Methil.

This was the largest structure lifted by any fabricator. At the centre are the two 110m trestle towers that carried the two pairs of lifting cables.

Once vertical, the three frames were connected together by cross members.

Brent Spar

Before the Brent pipeline was laid,  the  oil was  stored in a spar tethered to the seabed and exported into tanker.

 Thisis the spar being built for Brent

FLAGS

This is a pic of the FLAGS (Far-North Liquid and Associated Gas System) pipeline. – In 1982, this 36in line was the world’s longest submarine pipeline. This is the final section of the 450km line running from Brent to St Fergus being pulled in.