Beatrice

BNOC’s ¬†Beatrice AD drilling platform being lifted by the Crane Barge Balder. The platfomr was built by Redpath de Groot Caledonia at Methil. It was built in two parts.¬†

The Beatrice Drilling platform topsides were installed in 1980. The jacket was installed the previous year following drilling using the Zapata Nordic.